Street Sweeping

As part of the street cleaning management process, the Public Works Department sweeps all streets in the Village every 2 weeks between Spring and Fall.  Street sweeping helps maintain the aesthetics of neighborhoods.  It also lessens the effect of debris and vegetation on the storm drainage system and subsequent addition of volatile organic compounds (VOCs) and other contaminants to waterways. Street sweepers travel through the Village on 10 pre-planned routes.  All debris is collected and deposited at at the Public Works facility for removal by the Village’s waste hauler.

Crack Sealing

About Crack Sealing 
An effective way to help preserve village roads is through the annual crack sealing program. Routing, cleaning, andCrack Sealing pic sealing roadway cracks is an effective pavement preservation practice for streets that exhibit nominal pavement distress. The primary cause of asphalt failure is water infiltration into the street sub grade. The purpose of crack sealing is to prevent the intrusion  of water to the base. Stopping water from entering into and under the pavement keeps the base stable and the pavement strong. Crack sealing is one of the most cost-effective preventative maintenance practices for village roads. This year's project will incorporate a new propriety system that captures nearly 90% of all airborne dust particulate thus effectively reducing the mess.

What streets will be sealed? 
The Village's crack sealing contractor is scheduled  to begin crack sealing next week, April 29. The contractor anticipates completing the work in approximately two weeks. The map of crack filling locations for the current year's program can be found here. The list is comprehensive and the contractor may not complete the list.  Work will begin in the northeast section of the village and move to the southwest.  This project is heavily influenced by the weather which may impact completion and cause delay. 

Brick Sidewalk and Sealing

As part of the Village’s sidewalk maintenance program, brick sidewalks in the downtown business district are sealed to help prevent deterioration and resist staining. The goal of the brick sidewalk sealing program is to ensure sidewalks remain free of defects and aesthetically pleasing. Brick sidewalks are cleaned, sand added to joints and sealer applied through contractual services secured by the Village to ensure the integrity of the bricks before wear and weather allow deterioration of the bricks.

Sidewalk Maintenance

As part of the Village’s sidewalk maintenance program, sidewalks are replaced as needed when identified through the sidewalk inspection program, through our asset customer service software or otherwise notified via phone or walk-ins. The goal of the program is to replace sidewalk squares determined to present a hazard to ensure public safety. Sidewalk replacements are performed between April and November depending on availability of materials.

If you have any questions or would like to discuss potential trip hazards, please call Public Works 847-870-5640 or email publicworksdept@mountprospect.org