Skip to page body Home About Us What's New Residents Business Government I Want To…

Construction Projects Map

VILLAGE PROJECTS

1. STREET RESURFACING PROGRAM
Description: 36 streets / 6.96 miles of intermittent curb repair and asphalt resurfacing at various locations throughout the Village.  Please visit the Road Resurfacing webpage for details and current updates concerning the program.
Cost: $3,700,000
Contractor: Arrow Road Construction
Schedule: Start work - April 2016/ Complete Work - November 2016

2. CENTRAL RD / WELLER LN PEDESTRIAN CROSSING IMPROVEMENTS
Description: Installing median island in Central Road and relocating curb and sidewalk.
Cost: $ 
Contractor: Undetermined / Bid Opening July 2015
Schedule: Start work - August 2015 / Completion - October 2015

3. SIDEWALK IMPROVEMENT PROGRAMS (Various locations throughout the Village)
Description: Share Cost Sidewalk Replacement Program by request of property owners.
Cost: $85,000
Contractor: Undetermined / Bid Opening in May
Schedule: Start work - June 2015 / Completed 

4. CENTRAL ROAD / UNION PACIFIC RAILROAD CROSSING PEDESTRIAN GATES 
Description: Installing pedestrian gates at railroad crossing.
Cost: State Funded
Contractor: Undetermined
Schedule: Start work - August 2015 / Completion - October 2015

5. PRIVATE PROPERTY DRAINAGE SOLUTIONS (Various locations throughout the Village)
Description: Install drainage improvements at problem locations.
Cost: $100,000
Contractor: Undetermined / Bid Opening in June
Schedule: Start work - August 2015 / Completion - October 2015 

6. SANITARY SEWER MAIN LINING (Various locations throughout the Village)
Description: Rehabilitate sanitary sewer mains utilizing cured-in-place process.
Cost:
Contractor:  Undetermined /  Bid Opening Undetermined
Schedule:  Start work - July 2015 / Completion - November 2015

7. PUBLIC WORKS BUILDING HVAC REPLACEMENT (1700 W CENTRAL RD)
Description: Replacement of the existing HVAC units with new energy efficient units.
Cost: $446,000
Contractor: MGM Mechanical  
Schedule: Start Work – Spring 2015/ Completed

8. DOWNTOWN STREESCAPE PROGRAM (EAST NORTHWEST HW BETWEEN MAPLE AND ALBERT; WEST NORTHWEST HW BETWEEN FOREST AND FAIRVIEW)
Description:  Parkway improvements including installation of brick sidewalks, planter beds, street lights, and site furniture in the downtown commercial district.
Estimated Cost:  $1,100,000 ($678,000 covered by grant from the State of Illinois)
Contractor: Path Construction
Schedule:  Start Work - May 2015 / Complete Work - Fall 2015

9. AMR METER INSTALLATION
Description: Installation of automated water meters allowing for remote reading of water usage.
Cost:  $2,100,000
Contractor:  Badger Meter
Schedule: Start Work - January 2014 / Complete Works - 2016

10.  EMERGENCY GENERATOR INSTALLATION WELL 11
Description:  Install emergency power generator for Well 11 booster station and stand-by deep well.
Cost:  $575,000
Contractor:  Argon Electric
Schedule:  Start Work - May 2015 / Completed

11.  EVERGREEN AVENUE WATERMAIN IMPROVEMENTS (Maple Street to School Street)
Description:  Install larger diameter watermain to improve hydraulic performance of elevated water tank.
Cost:  $1,000,000
Contractor:  Undetermined / Bid Opening May 2015
Schedule:  Start work - June 2015 / Completed

12.  CENTRAL / ARTHUR PEDESTRIAN SIGNAL IMPROVEMENTS (Central Road and Arthur Avenue)
Description:  Installing pedestrian signals, cross walks and replacing curb ramps.
Cost:  $70,000 (Village Share $23,000)
Contractor:  Undetermined / Bid Opening Undetermined
Schedule:  Start Work - August 2015 / Complete Work - October 2015

13. ISABELLA DRAINAGE IMPROVEMENTS
Description:  Install large diameter (84") relief sewer.
Cost:  $7,500,000
Contractor:  ALamp Concrete
Schedule:  Start Work - March 2015 / Complete Work - December 2015

14. LINCOLN STREET BRIDGE REPAIR (Lincoln Street and Weller Creek)
Description:  Rehabilitate bridge.
Cost:  $150,000
Contractor:  Undetermined
Schedule:  Start Work - September 2015 / Completed

15. SANITARY SEWER SPOT REPAIRS
Description: Replace existing sections of sanitary sewer main pipe.
Cost:
Contractor:  Undetermined
Schedule:  Start Work - July 2015 / Complete Work - November 2015

16. SEE GWUN AVENUE TRAFFIC CALMING
Description: Install textured pavement, signage, speed feedback signs and replace curb and sidewalks in the 600 and 700 blocks.
Cost: $80,000
Contractor: J&R First in Asphalt 
Schedule:  Start Work - May 2015 / Completed

17. LINCOLN STREET TRAFFIC CALMING (See Gwun Avenue to Can Dota Avenue)
Description: Bump out curbs, relocate sidewalk ramps and stripe crosswalks.
Cost: 
Contractor: Arrow Road
Schedule: Start Work - June 2015 / Completed

18. KENSINGTON BUSINESS CENTER JOGGING PATH IMPROVEMENTS (Phase I 2015 and Phase II 2016)
Description: Replace existing asphalt jogging path and associated path lighting
Cost: $800,000
Contractor: Undetermined / June Bid Opening
Schedule:  Start Work - July 2015 / Phase I completed.

ILLINOIS DEPARTMENT OF TRANSPORTATION PROJECTS

19. RAND ROAD RESURFACING (Entire Length Thru Village)
Description: Intermittent curb repair, sidewalk ramp replacement and asphalt milling and resurfacing.
Schedule:  Summer 2015


ILLINOIS TOLLWAY PROJECTS

20. ELMHURST ROAD / OAKTON STREET IMPROVEMENTS (Elmhurst Rd and Oakton St)
Description: Improvements are related to the Route 83 / Tollway interchange and include rechannelization of lanes within the intersection include relocating of curb and sidewalk and pertinent utility relocations.

 

 

Last updated: 9/30/2016 12:31:23 PM