Construction Projects Map

VILLAGE PROJECTS

1. STREET RESURFACING PROGRAM
Description: 36 streets / 6.96 miles of intermittent curb repair and asphalt resurfacing at various locations throughout the Village.  Please visit the Road Resurfacing webpage for details and current updates concerning the program.
Cost: $3,700,000
Contractor: Arrow Road Construction
Schedule: Start work - April 2016/ Complete Work - November 2016


2. SIDEWALK IMPROVEMENT PROGRAMS (Various locations throughout the Village)
Description: Share Cost Sidewalk Replacement Program by request of property owners.
Cost: $85,000
Contractor: Undetermined / Bid Opening in May
Schedule: Start work - June 2015 / Completed 

3. PRIVATE PROPERTY DRAINAGE SOLUTIONS (Various locations throughout the Village)
Description: Install drainage improvements at problem locations.
Cost: $100,000
Contractor: Undetermined / Bid Opening in June
Schedule: Start work - August 2015 / Completion - October 2015 

4. SANITARY SEWER MAIN LINING (Various locations throughout the Village)
Description: Rehabilitate sanitary sewer mains utilizing cured-in-place process.
Cost:
Contractor:  Undetermined /  Bid Opening Undetermined
Schedule:  Start work - July 2015 / Completion - November 2015

5.  CENTRAL / ARTHUR PEDESTRIAN SIGNAL IMPROVEMENTS (Central Road and Arthur Avenue)
Description:  Installing pedestrian signals, cross walks and replacing curb ramps.
Cost:  $70,000 (Village Share $23,000)
Contractor:  Undetermined / Bid Opening Undetermined
Schedule:  Start Work - 2018

6. SANITARY SEWER SPOT REPAIRS
Description: Replace existing sections of sanitary sewer main pipe.
Cost:
Contractor:  Undetermined
Schedule:  Start Work - July 2015 / Complete Work - November 2015

7. Elm Street Watermain Improvements
Description: Replace approximately 1,300 lineal feet of 6" diameter watermain with 8" diameter watermain.
Cost:  $397,000
Contractor:  Patnick Construction
Schedule:  Start Work - September 2017 / Complete Work - November 2017

 

ILLINOIS DEPARTMENT OF TRANSPORTATION PROJECTS

7. Route 83  RESURFACING (Central Road heading North Thru Village Limits)
Description: Intermittent curb repair, sidewalk ramp replacement and asphalt milling and resurfacing.
Schedule:  Fall 2017